Reengineering the clinical laboratory. Transitioning to an open laboratory
- PMID: 10162664
Reengineering the clinical laboratory. Transitioning to an open laboratory
Similar articles
-
Automation. Part 1. Modular stepwise automation and the future of diagnostic testing.MLO Med Lab Obs. 1998 Apr;30(4):22-4, 26-7. MLO Med Lab Obs. 1998. PMID: 10178599 No abstract available.
-
Planning and implementing total laboratory automation at the North Shore-Long Island Jewish Health System Laboratories.MLO Med Lab Obs. 1999 Jun;31(6):46-8, 50, 52-4. MLO Med Lab Obs. 1999. PMID: 10539658
-
New technologies for laboratory productivity.J Healthc Mater Manage. 1994 Mar;12(3):30, 32, 34. J Healthc Mater Manage. 1994. PMID: 10134603
-
Turnaround times in the laboratory: a review of the literature.Clin Lab Sci. 1999 Mar-Apr;12(2):85-9. Clin Lab Sci. 1999. PMID: 10387493 Review.
-
Horizontal and vertical integration in hospital laboratories and the laboratory information system.Clin Lab Med. 1990 Sep;10(3):627-41. Clin Lab Med. 1990. PMID: 2253453 Review.