Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
. 2001 May;17(6):328-33.
doi: 10.1007/s003810000429.

Advantages of delayed VP shunting in post-haemorrhagic hydrocephalus seen in low-birth-weight infants

Affiliations

Advantages of delayed VP shunting in post-haemorrhagic hydrocephalus seen in low-birth-weight infants

A G Taylor et al. Childs Nerv Syst. 2001 May.

Abstract

The optimal timing of ventriculo-peritoneal (VP) shunt insertion in a neonate with post-haemorrhagic hydrocephalus (PHH) is uncertain. During the 8-year period from January 1989 to December 1996, 41 patients had VP shunts inserted for PHH at Red Cross War Memorial Children's Hospital. Data on 36 patients were sufficient for review in order to determine whether the timing of surgery in any way influenced the complication incidence of this intervention. Nine of the 36 patients had a serious complication, either infection or mechanical shunt obstruction, during their initial hospital admission (early period). Nineteen patients had surgery performed before day 35 after birth and all those with early complications were in this group. Seventeen patients had surgery delayed until after day 35, and none of these patients had an early complication. In this study a higher complication incidence was noted when a VP shunt was inserted prior to day 35 (Chi-square test P < 0.01). This most probably correlates with a high concentration of blood breakdown products in the cerebrospinal fluid during the first month after intra-ventricular haemorrhage.

PubMed Disclaimer

LinkOut - more resources