Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
Clinical Trial
. 2002 May;28(5):599-608.
doi: 10.1007/s00134-002-1257-y. Epub 2002 Mar 26.

Pre-operative optimisation employing dopexamine or adrenaline for patients undergoing major elective surgery: a cost-effectiveness analysis

Affiliations
Free article
Clinical Trial

Pre-operative optimisation employing dopexamine or adrenaline for patients undergoing major elective surgery: a cost-effectiveness analysis

Elisabeth Fenwick et al. Intensive Care Med. 2002 May.
Free article

Abstract

Objective: To compare the cost and cost-effectiveness of a policy of pre-operative optimisation of oxygen delivery (using either adrenaline or dopexamine) to reduce the risk associated with major elective surgery, in high-risk patients.

Methods: A cost-effectiveness analysis using data from a randomised controlled trial (RCT). In the RCT 138 patients undergoing major elective surgery were allocated to receive pre-operative optimisation employing either adrenaline or dopexamine (assigned randomly), or to receive routine peri-operative care. Differential health service costs were based on trial data on the number and cause of hospital in-patient days and the utilisation of health care resources. These were costed using unit costs from a UK hospital. The cost-effectiveness analysis related differential costs to differential life-years during a 2 year trial follow-up.

Results: The mean number of in-patient days was 16 in the pre-optimised groups (19 adrenaline; 13 dopexamine) and 22 in the standard care group. The number (%) of deaths, over a 2 year follow-up, was 24 (26%) in the pre-optimised groups and 15 (33%) in the standard care group. The mean total costs were EUR 11,310 in the pre-optimised groups and EUR 16,965 in the standard care group. Life-years were 1.68 in the pre-optimised groups and 1.46 in the standard care group. The probability that pre-operative optimisation is less costly than standard care is 98%. The probability that it dominates standard care is 93%.

Conclusions: Based on resource use and effectiveness data collected in the trial, pre-operative optimisation of high-risk surgical patients undergoing major elective surgery is cost-effective compared with standard treatment.

PubMed Disclaimer

Publication types

MeSH terms

LinkOut - more resources