Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
Clinical Trial
. 2003 Jul-Aug;18(4):544-51.

Immediate occlusal loading of Osseotite implants in the completely edentulous mandible

Affiliations
  • PMID: 12939006
Clinical Trial

Immediate occlusal loading of Osseotite implants in the completely edentulous mandible

Tiziano Testori et al. Int J Oral Maxillofac Implants. 2003 Jul-Aug.

Abstract

Purpose: This article reports the preliminary data from a clinical study of immediately loaded, full-arch, screw-retained prosthesis with distal extensions (hybrid prosthesis) supported by Osseotite implants placed in the edentulous mandible.

Materials and methods: Fifteen patients who received 103 implants were enrolled in this study. The first 2 patients received both immediately loaded and submerged implants, while the remaining patients had all implants immediately loaded. The first 9 patients received a temporary prosthesis within 4 hours of surgery, and the hybrid prosthesis, made of a titanium framework and acrylic resin teeth, was placed after 6 months. The last 6 patients received the same type of hybrid prosthesis within 36 hours of surgery. Marginal bone loss was monitored via periapical radiographs by a computerized technique.

Results: One failure (out of the 92 immediately loaded implants) occurred after 3 weeks of function because of infection. A cumulative success rate of 98.9% was achieved for up to 48 months of follow-up, while the prosthetic cumulative success rate for the same period was 100%. Marginal bone loss at the immediately loaded implants was within the generally accepted conventional limits for standard delayed loading protocols.

Discussion: This technique can reduce treatment time but should be applied with caution.

Conclusion: The preliminary results of this study suggest that rehabilitation of the edentulous mandible by an immediately loaded hybrid prosthesis supported by 5 to 6 implants may represent a viable alternative treatment to the classical delayed loading protocols.

PubMed Disclaimer

Similar articles

Cited by

Publication types