Interlocking schedules of reinforcement
- PMID: 13868350
- PMCID: PMC1404112
- DOI: 10.1901/jeab.1962.5-213
Interlocking schedules of reinforcement
Abstract
Four male pigmented rats were exposed to a procedure designed to investigate the relation between several performance measures and a schedule continuum ranging from FR 36 to FI 2 through four intermediate interlocking schedules. On all schedules, each subject developed a stable performance that was generally break-and-run. Analysis of the cumulative records, post-S(R) breaks, and running rates showed a continuum of performance related to the schedule continuum.
References
MeSH terms
LinkOut - more resources
Full Text Sources
