Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
Observational Study
. 2019 Aug;98(35):e16939.
doi: 10.1097/MD.0000000000016939.

The effect of tracheostomy delay time on outcome of patients with prolonged mechanical ventilation: A STROBE-compliant retrospective cohort study

Affiliations
Observational Study

The effect of tracheostomy delay time on outcome of patients with prolonged mechanical ventilation: A STROBE-compliant retrospective cohort study

Hsueh-Ping Tai et al. Medicine (Baltimore). 2019 Aug.

Abstract

The tracheostomy timing for patients with prolonged mechanical ventilation (PMV) was usually delayed in our country. Both physician decision time and tracheostomy delay time (time from physician's suggestion of tracheostomy to procedure day) affect tracheostomy timing. The effect of tracheostomy delay time on outcome has not yet been evaluated before.Patients older than 18 years who underwent tracheostomy for PMV were retrospectively collected. The outcomes between different timing of tracheostomy (early: ≤14 days; late: >14 days of intubation) were compared. We also analyzed the effect of physician decision time, tracheostomy delay time, and procedure type on clinical outcomes.A total of 134 patients were included. There were 57 subjects in the early tracheostomy group and 77 in the late group. The early group had significantly shorter mechanical ventilation duration, shorter intensive care unit stays, and shorter hospital stays than late group. There was no difference in weaning rate, ventilator-associated pneumonia, and in-hospital mortality. The physician decision time (8.1 ± 3.4 vs 18.2 ± 8.1 days, P < .001) and tracheostomy delay time (2.1 ± 1.9 vs 6.1 ± 6.8 days, P < .001) were shorter in the early group than in the late group. The tracheostomy delay time [odds ratio (OR) = 0.908, 95% confidence interval (CI) = 0.832-0.991, P = .031) and procedure type (percutaneous dilatation, OR = 2.489, 95% CI = 1.057-5.864, P = .037) affected successful weaning. Platelet count of >150 × 10/μL (OR = 0.217, 95% CI = 0.051-0.933, P = .043) and procedure type (percutaneous dilatation, OR = 0.252, 95% CI = 0.069-0.912, P = .036) were associated with in-hospital mortality.Shorter tracheostomy delay time is associated with higher weaning success. Percutaneous dilatation tracheostomy is associated with both higher weaning success and lower in-hospital mortality.

PubMed Disclaimer

Conflict of interest statement

The authors have no conflicts of interest to disclose.

Figures

Figure 1
Figure 1
Flowchart of enrollment and outcomes. ICU = intensive care unit, MV = mechanical ventilation.

References

    1. Durbin CG., Jr Tracheostomy: why, when, and how? Respir Care 2010;55:1056–68. - PubMed
    1. Cheung NH, Napolitano LM. Tracheostomy: epidemiology, indications, timing, technique, and outcomes. Respir Care 2014;59:895–915. - PubMed
    1. Adly A, Youssef TA, El-Begermy MM, et al. Timing of tracheostomy in patients with prolonged endotracheal intubation: a systematic review. Eur Arch Otorhinolaryngol 2018;275:679–90. - PubMed
    1. Meng L, Wang C, Li J, et al. Early vs late tracheostomy in critically ill patients: a systematic review and meta-analysis. Clin Respir J 2016;10:684–92. - PubMed
    1. Bice T, Nelson JE, Carson SS. To trach or not to trach: uncertainty in the care of the chronically critically ill. Semin Respir Crit Care Med 2015;36:851–8. - PMC - PubMed

Publication types

LinkOut - more resources