Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
. 2020 Dec 1;91(12):124503.
doi: 10.1063/5.0029006.

A cryogenic continuously rotating half-wave plate mechanism for the POLARBEAR-2b cosmic microwave background receiver

Affiliations
Free article

A cryogenic continuously rotating half-wave plate mechanism for the POLARBEAR-2b cosmic microwave background receiver

C A Hill et al. Rev Sci Instrum. .
Free article

Abstract

We present the design and laboratory evaluation of a cryogenic continuously rotating half-wave plate (CHWP) for the POLARBEAR-2b (PB-2b) cosmic microwave background receiver, the second installment of the Simons Array. PB-2b will observe at 5200 m elevation in the Atacama Desert of Chile in two frequency bands centered at 90 GHz and 150 GHz. In order to suppress atmospheric 1/f noise and mitigate systematic effects that arise when differencing orthogonal detectors, PB-2b modulates linear sky polarization using a CHWP rotating at 2 Hz. The CHWP has a 440 mm clear aperture diameter and is cooled to ≈50 K in the PB-2b receiver cryostat. It consists of a low-friction superconducting magnetic bearing and a low-torque synchronous electromagnetic motor, which together dissipate <2 W. During cooldown, a grip-and-release mechanism centers the rotor to <0.5 mm, and during continuous rotation, an incremental optical encoder measures the rotor angle with a noise level of 0.1 μrad/Hz. We discuss the experimental requirements for the PB-2b CHWP, the designs of its various subsystems, and the results of its evaluation in the laboratory. The presented CHWP has been deployed to Chile and is expected to see first light on PB-2b in 2020 or 2021.

PubMed Disclaimer