Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation
. 2022 Oct 6;17(10):e0275678.
doi: 10.1371/journal.pone.0275678. eCollection 2022.

Research on urban path selection of construction vehicles based on bi-objective optimization

Affiliations

Research on urban path selection of construction vehicles based on bi-objective optimization

Mengkai Liu et al. PLoS One. .

Abstract

With the implementation of urban central rail transit and old city reconstruction projects, construction vehicles frequently enter and depart the urban area. And because of its large volume and other characteristics, it increases the risk probability and severity of urban traffic accidents. This study takes the transportation path selection of construction vehicles as the breakthrough point, weighs the transportation efficiency and safety of construction vehicles, establishes a bi-objective optimization model, involving constraints such as height limit, weight limit, speed limit, direction limit and traffic limit and uses genetic algorithm to solve it. Finally, through case analysis, the user preference is adjusted to conduct functional test and description of the model. The results indicate that the model has the function of transportation vehicle path optimization. In the meantime, compared with the safest route, the time-consuming of the optimal route decreases by 16% and the risk increases by 7.4%, while the time-consuming of it increases by 5% and the risk decreases by 15.4% compared with the shortest route. Moreover, the corresponding coefficients of time-consuming and safety preference can reach about 0.65, and the relevant stakeholders have high acceptance of the route. Further improvement of construction vehicle management mechanism based on path optimization is one of the limited ways to effectively improve the current situation of construction vehicle management.

PubMed Disclaimer

Conflict of interest statement

The authors have declared that no competing interests exist.

Figures

Fig 1
Fig 1. Constraint conditions.
Fig 2
Fig 2. Simulated path.
Fig 3
Fig 3. Solving steps.
Fig 4
Fig 4. Case road network scope.
Fig 5
Fig 5. Time-consuming shortest route.
Fig 6
Fig 6. Comparison graph of objective function change.
Fig 7
Fig 7. Route comparison chart.
Fig 8
Fig 8. Management mechanism of transportation route.

Similar articles

References

    1. Guo PJ, Jiang JC. Fuzzy multi-criteria modeling and its application in the risk assessment of hazardous chemical materials road transportation. Journal of Nanjing University of Technology: Natural Science Edition. 2006;(05):57–62.
    1. Cafiso S, Di Graziano A, Pappalardo G. How to compare different national databases of HGV accidents to identify issues for safety improvements. Baltic Journal of Road and Bridge Engineering. 2013;8(2):124–132. doi: 10.3846/bjrbe.2013.16 - DOI
    1. Davies G, White H. Reducing accidents between construction vehicles and cyclists. Proceedings of the Institution of Civil Engineers—Civil Engineering. 2015;168(3):131–137. doi: 10.1680/cien.14.00049 - DOI
    1. Manson J, Cooper S, West A, Foster E, Cole E, Tai NRM. Major trauma and urban cyclists: physiological status and injury profile. Emergency Medicine Journal. 2013;30(1):32–37. doi: 10.1136/emermed-2011-200966 - DOI - PubMed
    1. Yang NN, Li XM, Dai S. Current Situations, Problems and Suggestions on Engineering Transport Vehicle Management. Comprehensive Transportation. 2017;39(06):15–18+37.