Case study: The downside of using a worst-case approach in occupational safety policy as an interpretation of the precautionary principle: Putting the uncertain UXO occupational safety risk into probabilistic perspective
- PMID: 39289319
- PMCID: PMC12087751
- DOI: 10.1111/risa.17653
Case study: The downside of using a worst-case approach in occupational safety policy as an interpretation of the precautionary principle: Putting the uncertain UXO occupational safety risk into probabilistic perspective
Abstract
Unexploded ordnance (UXO) from the World Wars on the North Sea floor pose an uncertain occupational safety risk for dredging and cable installation. At present mitigation strategies are based on an interpretation of the precautionary principle that uses a worst-case approach, that is, assuming that UXO will be encountered, will explode, and will harm people onboard. We propose a probabilistic framework to estimate the UXO risk. Using this probabilistic framework, we conclude that the UXO risk during cable installation meets the prevailing safety standard in the Netherlands. Furthermore, we demonstrate that the UXO risk is lower than the general maritime risk, that is, the occupational health risk caused by the mitigation is higher than the UXO risk itself. We conclude that even for uncertain occupational risks, such as the UXO risk in the North Sea, a probabilistic analysis can be more instrumental in the decision-making process on accepting and mitigating risks than using worst-case scenario thinking.
Keywords: Cable Installation; Precautionary principle; Probabilistic Risk Assessment; Unexploded ordnance (UXO); Worst‐case approach.
© 2024 The Author(s). Risk Analysis published by Wiley Periodicals LLC on behalf of Society for Risk Analysis.
Conflict of interest statement
The authors declare no conflicts of interest.
Similar articles
-
Quantifying the risks of unexploded ordnance at closed military bases.Environ Sci Technol. 2009 Jan 15;43(2):259-65. doi: 10.1021/es8014106. Environ Sci Technol. 2009. PMID: 19238949
-
Condition of in situ unexploded ordnance.Sci Total Environ. 2015 Feb 1;505:762-9. doi: 10.1016/j.scitotenv.2014.10.059. Epub 2014 Nov 5. Sci Total Environ. 2015. PMID: 25461079
-
Communicating quantitative information about unexploded ordnance risks to the public.Environ Sci Technol. 2013 May 7;47(9):4004-13. doi: 10.1021/es305254j. Epub 2013 Apr 10. Environ Sci Technol. 2013. PMID: 23514101
-
Risk management frameworks for human health and environmental risks.J Toxicol Environ Health B Crit Rev. 2003 Nov-Dec;6(6):569-720. doi: 10.1080/10937400390208608. J Toxicol Environ Health B Crit Rev. 2003. PMID: 14698953 Review.
-
The precautionary principle and pharmaceutical risk management.Drug Saf. 2005;28(6):465-71. doi: 10.2165/00002018-200528060-00001. Drug Saf. 2005. PMID: 15924501 Review.
References
-
- Aven, T. (2016). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1–13. 10.1016/j.ejor.2015.12.023 - DOI
-
- Aven, T. (2023). A risk and safety science perspective on the precautionary principle. Safety Science, 165, 106211. 10.1016/j.ssci.2023.106211 - DOI
-
- Aven, T. , & Vinnem, J. E. (2005). On the use of risk acceptance criteria in the offshore oil and gas industry. Reliability Engineering & System Safety, 90(1), 15–24. 10.1016/j.ress.2004.10.009 - DOI
-
- Bowers, J. (1994). Data for project risk analyses. International Journal of Project Management, 12(1), 9–16. 10.1016/0263-7863(94)90004-3 - DOI