Research on cognitive reliability model considering crew influence in main control room of digital nuclear power plant
- PMID: 40707775
- PMCID: PMC12290117
- DOI: 10.1038/s41598-025-12885-9
Research on cognitive reliability model considering crew influence in main control room of digital nuclear power plant
Abstract
Nowadays, human-system interaction way is gradually converted into digital way in large industry system. When an operator faces the change, cognitive process and reliability are also bound to change. For the situation, this paper proposed a Bayesian networks cognitive reliability model considering crew influence on human reliability. Based on traditional cognitive reliability influencing factors, this paper considered crew collaborative factors and analyzed cognitive phases. For each cognitive process and crew influence, the paper listed the influencing factors in detail and established a cognitive reliability model. For each cognitive process, corresponding calculation methods were presented based on Bayesian networks. Furthermore, by simulative analysis this proposed model had a good performance.In order to show the analysis process of proposed model, taking nuclear power plant as a background, an error probability about a safety injection(SI) scenario was quantitatively analyzed based on the proposed reliability model in this paper. The results of performance analysis and calculation process shown that the proposed model can be applied to nuclear power plant operator cognitive process evaluation.
Keywords: Bayesian networks; Cognitive reliability model; Crew influence; Human factors.
Conflict of interest statement
Declarations. Competing interests: The authors declare no competing interests.
Figures
References
-
- Carvalho, P. V., Dos Santos, I. L. & Vidal, M. C. Safety implications of cultural and cognitive issues in nuclear power plant operation. Appl. Ergon.37 (2), 211–223 (2006). - PubMed
-
- Yanzi Liu, X. et al. Yiqian Wu and Zhiyao liu,research on the cognitive reliability model of DCS + SOP in the ling’ao phase II nuclear power plant’s main control room. Nucl. Technol.207 (1), 74–93 (2020).
-
- Liu, Y. et al. Human reliability analysis for operators in the digital main control rooms of nuclear power plants. J. Nucl. Sci. Technol.57 (6), 719–733 (2020).
-
- Weber, P. & Jouffe, L. Complex system reliability modelling with dynamic object oriented bayesian networks (DOOBN). Reliab. Eng. Syst. Saf.91 (2), 149–162 (2006).
-
- Kohda, T. Weimin Cui,Risk-based reconfiguration of safety monitoring system using dynamic bayesian network. Reliabil. Eng. & Syst. Safety. 92 (12), 1716–1723 (2007).
Grants and funding
- 24B0846/the Scientific Research Projects of Hunan Provincial Department of Education
- 2022HY004/the Cultivation Natural Science Foundation of Hunan Institute of Technology
- 2023JJ40252,2025JJ70182/the Natural Science Foundation of Hunan Province
- 2023JJ40252,2025JJ70182/the Natural Science Foundation of Hunan Province
- S202511528015, S202511528070/the College Students' Innovation and Entrepreneurship Plan Projects of Hunan Province