The cost of work on a vehicle assembly line
- PMID: 668672
- DOI: 10.1080/00140137808931729
The cost of work on a vehicle assembly line
Similar articles
-
[Evaluation of tolerance of prolonged physical work as a function of the degree of endurance. I. Useflness of various tests determining physical endurance and the physiological cost of long-term physical exertion].Med Pr. 1977;28(1):21-30. Med Pr. 1977. PMID: 865265 Polish.
-
[A study of the variations in oxygen consumption and heart rate in different working areas in an automobile assembly plant in correlation with a physical aptitude test for exercise (cyclergometry)].Arch Belg Med Soc. 1967 Jan;25(1):1-57. Arch Belg Med Soc. 1967. PMID: 6043108 French. No abstract available.
-
[Dynamic electrocardiography and ergometric evaluation in estimation of the metabolic cost of industrial work activity].Boll Soc Ital Cardiol. 1981;26(10):995-1005. Boll Soc Ital Cardiol. 1981. PMID: 7349182 Italian. No abstract available.
-
[Exercise and the cardiovascular system].Duodecim. 1974;90(7):487-95. Duodecim. 1974. PMID: 4603527 Review. Finnish. No abstract available.
-
Exercise electrocardiography.Cardiovasc Clin. 1975;6(3):93-107. Cardiovasc Clin. 1975. PMID: 1100253 Review. No abstract available.
Cited by
-
Cardiorespiratory strain in jobs that require respiratory protection.Int Arch Occup Environ Health. 1985;55(3):195-206. doi: 10.1007/BF00383753. Int Arch Occup Environ Health. 1985. PMID: 3997263
MeSH terms
LinkOut - more resources
Full Text Sources