Feasibility of a nurse staffed lift team
- PMID: 9748905
Feasibility of a nurse staffed lift team
Abstract
The present investigation evaluated the feasibility of creating a lift team with existent medical center nursing staff. Four nurse volunteers at low risk for injury were trained in proper lifting techniques and equipment use. Scheduled and paged maximal assistance transfers were performed by rotating pairs of team members over 21 days. The team successfully completed 94% of requested lifts, averaging 25 per day. Transfers between bed and chair were performed most frequently with the aid of a transfer belt. Greatest demands for team services were on a nursing home unit and an extended/subacute care unit. Unit staff responded positively to the team. Further research is needed to determine the team's impact on unit wide staff injuries and to evaluate the long term effects of working as a lift team member.
Similar articles
-
Lifting teams in health care facilities: a literature review.AAOHN J. 2003 May;51(5):210-8. AAOHN J. 2003. PMID: 12769167 Review.
-
Lift team technologies elevate positive outcomes.Nurs Manage. 2007 Jul;38(7):50-2. doi: 10.1097/01.NUMA.0000281136.92818.4c. Nurs Manage. 2007. PMID: 17632297 No abstract available.
-
A patient lifting intervention for preventing the work-related injuries of nurses.Work. 2004;22(2):79-88. Work. 2004. PMID: 15004341
-
Back injury prevention: a lift team success story.AAOHN J. 2003 Jun;51(6):246-51. AAOHN J. 2003. PMID: 12846457
-
Prevention of disabling back injuries in nurses by the use of mechanical patient lift systems.J Long Term Eff Med Implants. 2004;14(6):521-33. doi: 10.1615/jlongtermeffmedimplants.v14.i6.70. J Long Term Eff Med Implants. 2004. PMID: 15698378 Review.
Cited by
-
Intervention strategies to reduce musculoskeletal injuries associated with handling patients: a systematic review.Occup Environ Med. 2003 Sep;60(9):E6. doi: 10.1136/oem.60.9.e6. Occup Environ Med. 2003. PMID: 12937202 Free PMC article.